Endura

Endura

Endura

Background

Endura was founded in Scotland in 1993 with a no-nonsense commitment to advancing the performance and function of cycle apparel for all. As a maverick brand, it immediately launched a host of novel and challenging products that have gone on to earn iconic status globally and in many cases reset the benchmark of function and durability for the industry. This philosophy and disruptive innovation has carried the brand from Scottish local hero to global market leader.

Endura have a huge sustainability programme. They are on a journey to become CO₂ negative by 2024. So alongside their ‘One Million Trees’ initiative, the installation of a commercial solar energy system was the next natural step on this journey. The bespoke 351kW system designed and installed by Centreco is predicted to save over 1620 tonnes of CO₂ over the next 25 years that would have been generated as a result of grid electricity.

Client Type

Owner Operator

Industry

Manufacturing and Distribution

Location

Livingstone, Scotland

Project Type

Tier One Solar Energy System – Roof Mounted

System Size

351kW

Installation Date

May 2022

The Brief

The Solution

Outcome

Feedback

Left Image
right Image

Flexiform Business Furniture

Flexiform Business Furniture

Flexiform Business Furniture

Background

With 50 years’ experience of the UK office furniture marketplace, Flexiform are proud of what they have achieved and what they have planned for the future. Flexiform design, manufacture and distribute office furniture with their success being based upon strong client relationships built around their knowledgeable, approachable team.

Already having ISO14001 and FSC Accreditation, the installation of a commercial solar energy system was next stage in their long term Environmental and Sustainability policies. After exploring the available market options, Centreco were selected to design and install a bespoke 128kW Solar Energy System that maximises the available roof space whilst providing the best commercial returns.

Client Type

Owner Operator

Industry

Manufacturing and Distribution

Location

Bradford

Project Type

Tier One Solar Energy System – Roof Mounted

System Size

128kW

Installation Date

June 2022

The Brief

The Solution

Outcome

Feedback

Left Image
right Image