Armultra Limited

Armultra Limited

Armultra Limited

Background

Armultra Ltd has been providing engineering solutions from its facility in Great Yarmouth since 1985. The company’s capabilities have grown substantially over the last 15 years since the relocation to a purpose built facility in 2001. The current facility occupies 160,000 square ft with dedicated mild steel and exotic metals workshops including goods inwards and pressure testing areas. The company also has a 12m training tower for Rope access, working at height and GWO training. This is supported by one of the largest archive of WPQR archives in the UK making us the engineering service provider of choice.

Armultra have all the systems and accreditations you would expect of one of the area’s leading engineering companies including ISO9001, 14001, IRATA , FPAL Accreditation and PED Module ‘H ‘& ‘H1’ and BS1090.This has enabled Armultra to strengthen its reputation in all key areas of expertise.

The installation of a Commercial Solar Energy by Centreco was the next stage of a wider environmental and sustainability programme for Armultra.

Client Type

Owner Operator

Industry

Engineering Solutions Provider

Location

Great Yarmouth

Project Type

Tier One Solar Energy System – Roof Mounted

System Size

124kW

Installation Date

January 2021

The Brief

The Solution

Outcome

Feedback

Left Image
right Image

Four Tees Engineers

Four Tees Engineers

Four Tees Engineers

Background

FTE are a professional steelwork specialist contractor offering a range of services including design, detailing, project management, welding, fabrication, surface treatment, trial assembly and site installation. With almost 40 years experience in light and heavy fabrication they have built a reputation for providing a professional service, meeting performance targets, high levels of quality control and safety to the rail, highways, marine and water treatment sectors.

Being involved with heavy manufacturing with clients including industry operators and major civil engineering contractors means that FTE were facing increased environmental and commercials pressures so looked towards a bespoke 48kW Solar Energy System designed and installed by Centreco to bolster their green credentials and provide stability over their electricity costs moving forward.

Client Type

Owner Operator

Industry

Engineering Solutions Provider

Location

Fareham

Project Type

Tier One Solar Energy System – Roof Mounted

System Size

48kW

Installation Date

June 2020

The Brief

The Solution

Outcome

Feedback

Left Image
right Image